B82 Lilienbergtunnel

Partner: Cegelec GmbH
Location: Völkermarkt, Austria

B82 Lilienbergtunnel

HIGHLIGHTS

  • Distributed control system
  • Redundant server station
  • 2 redundant PLC-stations
  • Interfaces: Futurit WVZ, Feig traffic counting, Esser fire panel, SNMP, Modbus, OPC
  • 4000 E/A data points
  • 6000 data points

Our services

  • Solution design
  • Application
  • Start up

The Cegelec GmbH counts on XAMControl for the realization of the distributed control and safety system for the Lilienbergtunnel. The Tunnel ist located on the new bypass Völkermarkt on the B82 and extends over a length of about 1300 m.

2 redundant PLC stations and one redundant central server are guaranteeing highest availability. Via this system all traffic lights, lighting, emergency- and fire-equipment are visualized, controlled and monitored. The simple interface integration, the open system for the design of the visualization and the uniform central programming and management of the entire control system were essential factors for the decision for XAMControl.

During the project the close cooperation with the future operators of the country led to a modern, as well as easy and intuitive solution.

By that the operator is supported to work quick and safe in case of emergency situation.

Contact

Daniel Seewald
  • Daniel Seewald
    Area Director - Traffic Management
  • 0043 3178 21800-136

More about the evon Projects in Traffic Management?

Fill in the form below our call Daniel Seewald!

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.